Meeting Notes 11/5/12
Meeting Type: Advisor Meeting
Attending:
Advisor(s): Dr. Frank, Dr. Harvey
Members: Sondra, Kyle, Darryl, Alex, Santi
Excused: Stuart, Greg
Action Items
- Arrange location for testing setup
- Interim design presentation (include all design changes)
Meeting Topics
- Progress report
- Reiterated need to arrange testing
Important Notes
- There wasn’t a lot to report
- It would probably be best if we had more ready for next time
Transcript (Notes)
- Current progress
- We got the IMU, but it doesn’t work very well from the Arduinos
- We want the IMU on the Arduino to parallelize the balance functions
- We aren’t to use the IMU that we have rather than finagling the software to run it simultaneously with the vision software
- The group believes that the Arduino communication is one-way, but I thought it would be two-way
- Mention the change in our components
- Mechanical Progress
- Issues acquiring parts
- Wanted to build a prototype, but they messed up the parts so we’ve ordered a sheet and are going to cut it ourselves
- Electrical
- No major changes, got batteries and got the computer
- Programming
- Currently setting up Ubuntu environment
- Testing
- Scale down the testing equipment to work in shallower environment
- Talk to Morcom again about testing, need a few hours, large areas
- Make an appointment for as soon as we know we’ll have a working model
Group Notes